Tender No | Centre Name | Tender Description | Bid Closing Date (IST) | Bid Opening Date (IST) | Actions |
---|---|---|---|---|---|
SA202500063401 | SAC | Laser Safety Curtains Setup & accessories | 07-July-2025 13:00 | 07-July-2025 14:00 | |
SA202500121201 | SAC | Development of Deployable Telescopic Composite Boom | 11-July-2025 11:32 | 11-July-2025 12:32 | |
IP202500067201 | IPRC | Supply of liquid Hydrogen in ISO cryogenic tankers | 15-July-2025 11:00 | 15-July-2025 11:01 | |
SH202500068701 | SDSC SHA | Supply of Dowcal 100 | 12-July-2025 16:30 | 14-July-2025 14:30 | |
IS202500035001 | URSC | Phase noise and Allan deviation measurement system | 04-July-2025 14:00 | 04-July-2025 14:30 | |
IS202500059201 | URSC | SUPPLY OF PARA-ARAMID FABRIC AND PARA-ARAMID TAPE | 04-July-2025 14:30 | 04-July-2025 15:00 | |
SH202400154301 | SDSC SHA | Supply, Installation, Testing and Commissioning of 22KV VCB Panel at PCR | 11-July-2025 14:00 | 11-July-2025 14:30 | |
MC202400014101 | MCF | Supply of 2 Nos. of GaN based C-band SSPA with integral L- band BUC and remote controller unit for interfacing with the SSPA | 10-July-2025 17:00 | 11-July-2025 10:00 | |
VS202400587801 | VSSC | DESIGN, SUPPLY, INSTALLATION AND COMMISIONING OF SEMI AUTOMATIC NICKEL PLATING TANK WITH ACESSORIES ? 1 SET | 28-July-2025 14:00 | 28-July-2025 14:05 | |
SH202400147801 | SDSC SHA | Augmentation of various Networks | 10-July-2025 16:00 | 11-July-2025 14:30 | |
SA202500049701 | SAC | Need Based Maintenance Contract for Sentech ICP-RIE System and Associated Gas Distribution System | 10-July-2025 18:00 | 11-July-2025 10:00 | |
SA202500026301 | SAC | 2TB PXIe Storage Drive | 10-July-2025 17:54 | 10-July-2025 17:56 | |
SA202400121301 | SAC | 1550nm incoherent pulsed Laser module | 02-July-2025 13:00 | 02-July-2025 14:00 | |
SH202500061301 | SDSC SHA | Supply, Replacement, Erection, Commissioning and non-comprehensive preventive maintenance of detectors and FDA panels for SLP facilities and FCC II | 07-July-2025 14:00 | 07-July-2025 14:00 | |
IS202500066001 | URSC | Spares for RO Water coolers | 04-July-2025 14:00 | 04-July-2025 14:30 | |
IS202500036201 | URSC | LAYOUT PREPARATION Work Package for QC Inspection of PCB Layout Design | 04-July-2025 14:00 | 04-July-2025 14:30 | |
IS202500053401 | URSC | Buffers | 04-July-2025 14:00 | 04-July-2025 14:30 | |
SA202500100501 | SAC | Centralised Desktop Management Solution | 11-July-2025 14:00 | 11-July-2025 14:30 | |
TR202500013001 | ISTRAC | Packaged Unit for Data Diode Appliance for ISTRAC | 10-July-2025 12:05 | 10-July-2025 13:05 | |
VS202400729401 | VSSC | Elemental Analyzer-Gas Chromatography-Continuous Flow- Isotope Ratio Mass Spectrometer (EA-GC-CF-IRMS) | 14-July-2025 14:00 | 14-July-2025 15:00 | |
IS202400138701 | URSC | Supply and installation of ESD flooring tiles for power and control lab | 02-July-2025 10:00 | 02-July-2025 10:30 | |
SA202500038901 | SAC | SPACE QUALIFIED ONBOARD PROCESSING UNIT (OPU) | 09-July-2025 15:00 | 09-July-2025 15:15 | |
LE202500021401 | LEOS | FC/APC PM fiber optic Patchcord | 02-July-2025 17:00 | 03-July-2025 10:30 | |
LE202500019901 | LEOS | PM 1550nm Fiber Optic Circulator | 02-July-2025 17:00 | 03-July-2025 10:30 | |
LE202500018701 | LEOS | PHOTOGRAMMETRY TARGET | 02-July-2025 17:00 | 03-July-2025 10:30 | |
SA202500119401 | SAC | PHASED MATCHED 50 OHM CABLE ASSEMBLIES | 01-July-2025 13:00 | 01-July-2025 14:00 | |
LE202500011401 | LEOS | PROTO / Engineering Grade Reprogrammable Flash FPGA | 08-July-2025 17:00 | 09-July-2025 10:30 | |
LE202500021301 | LEOS | Large beam fiber collimator | 02-July-2025 17:00 | 03-July-2025 10:30 | |
LE202500021201 | LEOS | High resolution thermal imaging camera with accesories | 02-July-2025 17:00 | 03-July-2025 10:30 | |
LE202500023101 | LEOS | PM 1550nm in-line faraday rotator | 02-July-2025 17:00 | 03-July-2025 10:30 | |
LE202500023001 | LEOS | ZERO ORDER QUARTER WAVE PLATE | 02-July-2025 17:00 | 03-July-2025 10:30 | |
LE202500022301 | LEOS | Upscreening and Qualification of Fiber Optic Components | 02-July-2025 17:00 | 03-July-2025 10:30 | |
LE202500019601 | LEOS | PM 1550nm Optical Fiber Single Channel Transceiver | 02-July-2025 17:00 | 03-July-2025 10:30 | |
LE202500011701 | LEOS | NX Drafting Services | 02-July-2025 17:00 | 03-July-2025 10:30 | |
LE202500018901 | LEOS | Single axis Linear Translation stage with controller | 02-July-2025 17:00 | 03-July-2025 10:30 | |
VS202500220001 | VSSC | Design, realization, installation, commissioning and performance demonstration of a Turbo Molecular Pumping (TMP) station at STED/ASOE/ VSSC as per following specifications and attached schematic drawing. | 10-July-2025 14:00 | 10-July-2025 14:01 | |
IS202500042401 | URSC | Vessel chartering and transportation for deployment of Ship borne antenna Terminal near Cocos Keeling Island for Gaganyaan G1 mission support | 30-June-2025 14:30 | 30-June-2025 15:00 | |
IS202500020901 | URSC | Fabrication and screening of 16 Channel solid state HMC | 01-July-2025 14:30 | 01-July-2025 15:00 | |
SA202500063701 | SAC | Development of Multimedia Processing System | 30-June-2025 13:00 | 30-June-2025 14:00 | |
SA202500076601 | SAC | Requirement of high resolution electronic global shutter image sensor | 08-July-2025 15:00 | 08-July-2025 15:30 | |
LP202500050401 | LPSC | Comprehensive AMC for Campus Network | 20-June-2025 14:30 | 20-June-2025 14:30 | |
SA202500111201 | SAC | 32-Chnannel thermocouple DAQ system | 30-June-2025 12:00 | 30-June-2025 14:00 | |
IS202500034701 | URSC | Retrofitting of Optical profile Projector of NIKON Make Model No:V-24B. | 07-July-2025 14:30 | 07-July-2025 15:00 | |
SA202500104401 | SAC | Metallic C-ring with energized spring | 04-July-2025 11:00 | 04-July-2025 11:05 | |
TR202500014801 | ISTRAC | Development of Digital Array based Telemetry System | 18-July-2025 13:07 | 18-July-2025 14:07 | |
SA202500110601 | SAC | Linear Programmable 3 Channel DC Power Supplies | 30-June-2025 14:00 | 30-June-2025 15:00 | |
SA202500102601 | SAC | CMOS RFIC CHARCTERIZATION SETUP | 30-June-2025 15:00 | 30-June-2025 16:00 | |
SA202500101301 | SAC | DC Power supply | 30-June-2025 12:00 | 30-June-2025 13:00 | |
VS202500128301 | VSSC | Fixation of rate for TRISP Application | 03-July-2025 14:00 | 03-July-2025 14:30 | |
IS202500052301 | URSC | 6DOF Vehicular Motion Testing and Time Synchronization Unit | 26-June-2025 14:30 | 26-June-2025 15:00 |