1 |
Sporadic Work Outsourcing Contract Checking of level gauges of the propellant and water tanks and noting the minimum and maximum liquid levels in the tanks for each test/ operation. |
904Nos.
|
2 |
Sporadic Work Outsourcing Contract Checking of measurement devices viz., pressure gauges, flow meters, thrust balance etc., and their insitu-calibration in the facilities prior to each test/ operation |
1,168Nos.
|
3 |
Sporadic Work Outsourcing Contract Pneumatic leak check of lines individually for the respective operating pressure and check of the entire joints with snoop solution for each series of tests. |
10,570Joint
|
4 |
Sporadic Work Outsourcing Contract Pneumatic leak check of command system lines along with their distribution joints with snoop solution for each series of tests/operations. |
7,550Joint
|
5 |
Sporadic Work Outsourcing Contract Pneumatic leak check of run tanks and H.P. Cylinders with snoop solution for each series of tests/ operations. |
9,060Nos.
|
6 |
Sporadic Work Outsourcing Contract Checking of all the pressure regulators for the operation and pressure setting for each test. |
9,040Nos.
|
7 |
Sporadic Work Outsourcing Contract Functional checks of electro pneumatic valves for each test series |
4,832Nos.
|
8 |
Sporadic Work Outsourcing Contract Pneumatic leaks check of electro pneumatic valve joints with snoop solution for each series of tests/operations. |
10,570Joint
|
9 |
Sporadic Work Outsourcing Contract Functional checks on vacuum pumps and valves for each test. |
512Nos.
|
10 |
Sporadic Work Outsourcing Contract Vacuum leak checks for vacuum chambers. |
256Nos.
|
11 |
Sporadic Work Outsourcing Contract Functional and pneumatic leak checking of control valves for each test series. |
1,024Nos.
|
12 |
Sporadic Work Outsourcing Contract Checking of pressure gauges in the facilities for the periodical calibration validity. |
1,167Nos.
|
13 |
Sporadic Work Outsourcing Contract Checking of safety relief valves in facilities for the periodical calibration validity. |
502Nos.
|
14 |
Sporadic Work Outsourcing Contract Checking of filters for any damage under 10X magnification and clearing for the tests. |
274Nos.
|
15 |
Sporadic Work Outsourcing Contract Inspection of Hydro-testing of flexible hoses |
248Nos.
|
16 |
Sporadic Work Outsourcing Contract Inspection during replacement of burst diaphragms & bellows |
62Nos.
|
17 |
Sporadic Work Outsourcing Contract Pneumatic leak checks of propellant run tanks, storage tanks, internal and road tankers |
256Nos.
|
18 |
Sporadic Work Outsourcing Contract Checking of H.P. Cylinder in the facilities for the periodical testing validity and subsequent leak check. |
126Nos.
|
19 |
Sporadic Work Outsourcing Contract Inspection of load testing on material handling equipments like E.O.T. Cranes, chain pulley blocks and hydraulic moving platforms. |
24Nos.
|
20 |
Sporadic Work Outsourcing Contract Hydro-test of facility run tanks and active fluid circuits. |
354Nos.
|
21 |
Sporadic Work Outsourcing Contract Verification of safety equipments viz., scrubbers, pollution monitors, deluges etc., |
176Nos.
|
22 |
Sporadic Work Outsourcing Contract Visual inspection of for the facility elements like structures, pipes, flow components , fittings & filler materials and verification of certificates |
7,940Nos.
|
23 |
Sporadic Work Outsourcing Contract Witnessing of welding procedure & welders’ performance qualification tests. |
36Nos.
|
24 |
Sporadic Work Outsourcing Contract Inspection of fit-up for welding joints and clearance for welding. |
1,672Joint
|
25 |
Sporadic Work Outsourcing Contract Dye penetrant test of welded joints |
2,290Joint
|
26 |
Sporadic Work Outsourcing Contract Verification of radiography for butt welded joints |
618Joint
|
27 |
Sporadic Work Outsourcing Contract Witnessing of hydro-testing for the fabricated lines |
176Nos.
|
28 |
Sporadic Work Outsourcing Contract Verification of pickling & passivation of lines |
176Nos.
|
29 |
Sporadic Work Outsourcing Contract Checking of moisture level for propellant and gas lines. |
176Nos.
|
30 |
Sporadic Work Outsourcing Contract Checking of contamination level in lines. |
176Nos.
|
31 |
Sporadic Work Outsourcing Contract Pneumatic leak checks on fluid circuits. |
88Nos.
|
32 |
Sporadic Work Outsourcing Contract Inward inspection of bought out items at IPRC stores for MIRV clearance. |
1,519Nos.
|
33 |
Sporadic Work Outsourcing Contract Visual Inspection of Components |
64,146Nos.
|
34 |
Sporadic Work Outsourcing Contract Verification and measurement of Metal Cutting Operations on Structures |
6,306Nos.
|
35 |
Sporadic Work Outsourcing Contract Verification of End Fittings before welding |
9,495Joint
|
36 |
Sporadic Work Outsourcing Contract Hydro test related inspection of Plumbings, Hoses, Bellows and Components |
10,785Nos.
|
37 |
Sporadic Work Outsourcing Contract Pneumatic test related inspection of Plumbings, Hoses, Bellows and Components |
8,070Nos.
|
38 |
Sporadic Work Outsourcing Contract MSLD Leak Check of Lines, Bellows and Components |
1,860Nos.
|
39 |
Sporadic Work Outsourcing Contract Cleanliness Check related inspection of Plumbings, Hoses and Components |
11,085Nos.
|
40 |
Sporadic Work Outsourcing Contract Ball Rolling test of Plumbings |
4,453Nos.
|
41 |
Sporadic Work Outsourcing Contract Weighing of Components |
41,808Nos.
|
42 |
Sporadic Work Outsourcing Contract Torque Verification of joints and fasteners |
102,198Joint
|
43 |
Sporadic Work Outsourcing Contract Leak testing of Interfaces |
25,527Joint
|
44 |
Sporadic Work Outsourcing Contract Inspection activities(leak checks)at PPTF, WFTF, ATS and PTS facilities |
5,467Nos.
|
45 |
Sporadic Work Outsourcing Contract Verification of routing of Fluid circuits and interfaces |
10,050Joint
|
46 |
Sporadic Work Outsourcing Contract Verification of Hardware Clearance, Reports and, Documents |
47,550Nos.
|
47 |
Sporadic Work Outsourcing Contract Marking on thrust chamber for gap measurement, projection measurement and alignment inspection by indexing |
5,520Nos.
|
48 |
Sporadic Work Outsourcing Contract Thrust chamber measurements before and after throat fixing |
37,200Nos.
|
49 |
Sporadic Work Outsourcing Contract Thrust chamber alignment inspection measurements |
11,280Nos.
|
50 |
Sporadic Work Outsourcing Contract Coating thickness measurements, roughness measurements and UV lamp inspection during thrust chamber coating and sub systems components coating |
64,350Nos.
|
51 |
Sporadic Work Outsourcing Contract MSLD Leak Check of engine interfaces |
1,749Joint
|
52 |
Sporadic Work Outsourcing Contract Tubing ball checks |
3,684Nos.
|
53 |
Sporadic Work Outsourcing Contract Hydro test related inspection of tubings and components |
1,899Nos.
|
54 |
Sporadic Work Outsourcing Contract Visual inspection of components for defects in functionally critical areas and surfaces |
40,029Nos.
|
55 |
Sporadic Work Outsourcing Contract Visual inspection of bought-outs before assembly |
101,829Nos.
|
56 |
Sporadic Work Outsourcing Contract Visual inspection of tubings for defects in leak arresting surface and external surfaces |
6,858Nos.
|
57 |
Sporadic Work Outsourcing Contract Post hot test inspection |
17,412Nos.
|
58 |
Sporadic Work Outsourcing Contract Piston travel, projection and gap measurements during subsystem assembly and integration |
7,200Nos.
|
59 |
Sporadic Work Outsourcing Contract Tubing routing checks |
6,582Joint
|
60 |
Sporadic Work Outsourcing Contract Leak tests for integrated engine assembly |
72,198Joint
|