Sl.No Item Name Quantity
1 Sporadic Work Outsourcing Contract Checking of level gauges of the propellant and water tanks and noting the minimum and maximum liquid levels in the tanks for each test/ operation. 904Nos.
2 Sporadic Work Outsourcing Contract Checking of measurement devices viz., pressure gauges, flow meters, thrust balance etc., and their insitu-calibration in the facilities prior to each test/ operation 1,168Nos.
3 Sporadic Work Outsourcing Contract Pneumatic leak check of lines individually for the respective operating pressure and check of the entire joints with snoop solution for each series of tests. 10,570Joint
4 Sporadic Work Outsourcing Contract Pneumatic leak check of command system lines along with their distribution joints with snoop solution for each series of tests/operations. 7,550Joint
5 Sporadic Work Outsourcing Contract Pneumatic leak check of run tanks and H.P. Cylinders with snoop solution for each series of tests/ operations. 9,060Nos.
6 Sporadic Work Outsourcing Contract Checking of all the pressure regulators for the operation and pressure setting for each test. 9,040Nos.
7 Sporadic Work Outsourcing Contract Functional checks of electro pneumatic valves for each test series 4,832Nos.
8 Sporadic Work Outsourcing Contract Pneumatic leaks check of electro pneumatic valve joints with snoop solution for each series of tests/operations. 10,570Joint
9 Sporadic Work Outsourcing Contract Functional checks on vacuum pumps and valves for each test. 512Nos.
10 Sporadic Work Outsourcing Contract Vacuum leak checks for vacuum chambers. 256Nos.
11 Sporadic Work Outsourcing Contract Functional and pneumatic leak checking of control valves for each test series. 1,024Nos.
12 Sporadic Work Outsourcing Contract Checking of pressure gauges in the facilities for the periodical calibration validity. 1,167Nos.
13 Sporadic Work Outsourcing Contract Checking of safety relief valves in facilities for the periodical calibration validity. 502Nos.
14 Sporadic Work Outsourcing Contract Checking of filters for any damage under 10X magnification and clearing for the tests. 274Nos.
15 Sporadic Work Outsourcing Contract Inspection of Hydro-testing of flexible hoses 248Nos.
16 Sporadic Work Outsourcing Contract Inspection during replacement of burst diaphragms & bellows 62Nos.
17 Sporadic Work Outsourcing Contract Pneumatic leak checks of propellant run tanks, storage tanks, internal and road tankers 256Nos.
18 Sporadic Work Outsourcing Contract Checking of H.P. Cylinder in the facilities for the periodical testing validity and subsequent leak check. 126Nos.
19 Sporadic Work Outsourcing Contract Inspection of load testing on material handling equipments like E.O.T. Cranes, chain pulley blocks and hydraulic moving platforms. 24Nos.
20 Sporadic Work Outsourcing Contract Hydro-test of facility run tanks and active fluid circuits. 354Nos.
21 Sporadic Work Outsourcing Contract Verification of safety equipments viz., scrubbers, pollution monitors, deluges etc., 176Nos.
22 Sporadic Work Outsourcing Contract Visual inspection of for the facility elements like structures, pipes, flow components , fittings & filler materials and verification of certificates 7,940Nos.
23 Sporadic Work Outsourcing Contract Witnessing of welding procedure & welders’ performance qualification tests. 36Nos.
24 Sporadic Work Outsourcing Contract Inspection of fit-up for welding joints and clearance for welding. 1,672Joint
25 Sporadic Work Outsourcing Contract Dye penetrant test of welded joints 2,290Joint
26 Sporadic Work Outsourcing Contract Verification of radiography for butt welded joints 618Joint
27 Sporadic Work Outsourcing Contract Witnessing of hydro-testing for the fabricated lines 176Nos.
28 Sporadic Work Outsourcing Contract Verification of pickling & passivation of lines 176Nos.
29 Sporadic Work Outsourcing Contract Checking of moisture level for propellant and gas lines. 176Nos.
30 Sporadic Work Outsourcing Contract Checking of contamination level in lines. 176Nos.
31 Sporadic Work Outsourcing Contract Pneumatic leak checks on fluid circuits. 88Nos.
32 Sporadic Work Outsourcing Contract Inward inspection of bought out items at IPRC stores for MIRV clearance. 1,519Nos.
33 Sporadic Work Outsourcing Contract Visual Inspection of Components 64,146Nos.
34 Sporadic Work Outsourcing Contract Verification and measurement of Metal Cutting Operations on Structures 6,306Nos.
35 Sporadic Work Outsourcing Contract Verification of End Fittings before welding 9,495Joint
36 Sporadic Work Outsourcing Contract Hydro test related inspection of Plumbings, Hoses, Bellows and Components 10,785Nos.
37 Sporadic Work Outsourcing Contract Pneumatic test related inspection of Plumbings, Hoses, Bellows and Components 8,070Nos.
38 Sporadic Work Outsourcing Contract MSLD Leak Check of Lines, Bellows and Components 1,860Nos.
39 Sporadic Work Outsourcing Contract Cleanliness Check related inspection of Plumbings, Hoses and Components 11,085Nos.
40 Sporadic Work Outsourcing Contract Ball Rolling test of Plumbings 4,453Nos.
41 Sporadic Work Outsourcing Contract Weighing of Components 41,808Nos.
42 Sporadic Work Outsourcing Contract Torque Verification of joints and fasteners 102,198Joint
43 Sporadic Work Outsourcing Contract Leak testing of Interfaces 25,527Joint
44 Sporadic Work Outsourcing Contract Inspection activities(leak checks)at PPTF, WFTF, ATS and PTS facilities 5,467Nos.
45 Sporadic Work Outsourcing Contract Verification of routing of Fluid circuits and interfaces 10,050Joint
46 Sporadic Work Outsourcing Contract Verification of Hardware Clearance, Reports and, Documents 47,550Nos.
47 Sporadic Work Outsourcing Contract Marking on thrust chamber for gap measurement, projection measurement and alignment inspection by indexing 5,520Nos.
48 Sporadic Work Outsourcing Contract Thrust chamber measurements before and after throat fixing 37,200Nos.
49 Sporadic Work Outsourcing Contract Thrust chamber alignment inspection measurements 11,280Nos.
50 Sporadic Work Outsourcing Contract Coating thickness measurements, roughness measurements and UV lamp inspection during thrust chamber coating and sub systems components coating 64,350Nos.
51 Sporadic Work Outsourcing Contract MSLD Leak Check of engine interfaces 1,749Joint
52 Sporadic Work Outsourcing Contract Tubing ball checks 3,684Nos.
53 Sporadic Work Outsourcing Contract Hydro test related inspection of tubings and components 1,899Nos.
54 Sporadic Work Outsourcing Contract Visual inspection of components for defects in functionally critical areas and surfaces 40,029Nos.
55 Sporadic Work Outsourcing Contract Visual inspection of bought-outs before assembly 101,829Nos.
56 Sporadic Work Outsourcing Contract Visual inspection of tubings for defects in leak arresting surface and external surfaces 6,858Nos.
57 Sporadic Work Outsourcing Contract Post hot test inspection 17,412Nos.
58 Sporadic Work Outsourcing Contract Piston travel, projection and gap measurements during subsystem assembly and integration 7,200Nos.
59 Sporadic Work Outsourcing Contract Tubing routing checks 6,582Joint
60 Sporadic Work Outsourcing Contract Leak tests for integrated engine assembly 72,198Joint