Sl.No Item Name Quantity
1 ERECTION AND COMMISSIONING Erection and commissioning of Pollution Monitoring system at OMPF as per specifications / work scope in 5.1 of Annexure - 1 1Lot
2 ERECTION AND COMMISSIONING Installation and internal wiring of Instrument racks as per specifications / work scope in 5.2 of Annexure - 1 4Nos.
3 ERECTION AND COMMISSIONING Gas detection sensors Erection and commissioning at CESB of SLP as per specifications / work scope in 5.3 of Annexure - 1 1Lot
4 ERECTION AND COMMISSIONING Installation and internal wiring of Instrumentation junction boxes as per specifications / work scope in 5.4 of Annexure - 1 3Nos.
5 ERECTION AND COMMISSIONING Installation and internal wiring of Field junction boxes as per specifications / work scope in 5.5 of Annexure - 1 6Nos.
6 ERECTION AND COMMISSIONING Refurbishment of Gas check system panels as per specifications / work scope in 5.6 of Annexure - 1 4Nos.
7 ERECTION AND COMMISSIONING Installation and interfaces of RTD based Temperature sensors to Remote I/o as per specifications / work scope in 5.7 of Annexure - 1 1Lot
8 ERECTION AND COMMISSIONING Refurbishment of Safety control panels as per specifications / work scope in 5.8 of Annexure - 1 3Nos.
9 ERECTION AND COMMISSIONING Data / control cable laying from field junction box to field instruments as per specifications / work scope in 5.9 (A) of Annexure - 1 4KM
10 ERECTION AND COMMISSIONING Data / control cable laying from field junction box to Instrumentation junction box as per specifications / work scope in 5.9 (B) of Annexure - 1 2KM
11 ERECTION AND COMMISSIONING Data / control cable laying from Instrumentation junction box to remote I/o (with in Building) as per specifications / work scope in 5.9 (C) of Annexure - 1 1.5KM
12 ERECTION AND COMMISSIONING Data / control cable laying from Instrument racks to Power distribution racks (with in Building) as per specifications / work scope in 5.9 (D) of Annexure - 1 1KM
13 ERECTION AND COMMISSIONING Glanding for Data / control / Power cables at Junction boxes as per specifications / work scope in 5.10 (A,B &C) of Annexure - 1 1Lot
14 ERECTION AND COMMISSIONING Crimping type connectors for Data / control / Power cables at Junction boxes as per specifications / work scope in 5.11 of Annexure - 1 1Lot
15 ERECTION AND COMMISSIONING Technical support for Qualification of system as per specifications / work scope in 5.12 of Annexure - 1 1Lot
16 ERECTION AND COMMISSIONING Removal of Ex proof junction boxes and associated wiring interfaces as per specifications / work scope in 5.13 of Annexure - 1 15Nos.