1 |
Master/Login/Management Nodes |
20Nos.
|
2 |
CPU only Compute Nodes – (Required number of CPU only nodes to achieve 2.8PFRmax (sustained LINPACK)) with minimum 256GB RAM/node and min 4GB RAM/Core |
1Lot
|
3 |
8GB RAM per core Compute Nodes (Min 512GB RAM/node) |
100Nos.
|
4 |
16GB RAM per core compute nodes (Min 1024GB RAM/node) |
10Nos.
|
5 |
Compute Nodes with nVidia GPU |
40Nos.
|
6 |
Rack mountable Monitor, keyboard and Mouse |
2Nos.
|
7 |
PFS Storage - (2.5 PiB) |
1Lot
|
8 |
Archive Storage - 1 PiB for PFS Storage |
1Lot
|
9 |
NAS Storage (2.0PiB + 2.0PiB) |
1Lot
|
10 |
Archive Storage- 1 PiB for NAS Storage |
1Lot
|
11 |
Tape library, server and backup software |
1Lot
|
12 |
Ethernet Switches |
1Lot
|
13 |
FC Switch |
1Lot
|
14 |
HPC Communication Network - Primary |
1Lot
|
15 |
HPC Communication Network - Secondary |
1Lot
|
16 |
SOFTWARE - Development tools |
1Lot
|
17 |
SOFTWARE - Scheduler |
1Lot
|
18 |
SOFTWARE - Cluster management tool |
1Lot
|
19 |
Front-End Workstation |
20Nos.
|
20 |
ADDITIONAL ITEMS - if any required to complete the Solution for 2.8 PF SUSTAINED HPC ECOSYSTEM |
1Lot
|
21 |
Installation & Commissioning charges for sl no 1 to 20 |
1Lot
|
22 |
MANPOWER Charges for One System Administration and one Application Engineer |
60Month
|
23 |
Electrical System including Panels, DBs, Cable Tray, Earthing, Cables ,Illumination etc. |
1Lot
|
24 |
UPS and Battery System for IT equipments |
1Lot
|
25 |
UPS and Battery System for NON IT equipmentS |
1Lot
|
26 |
UPS and Battery System for Data Centre Part along with input and output panels |
1Lot
|
27 |
HVAC System including Drycooler/Chiller, RDHX, PAC/PAHU, Piping, Thermal Storage etc. |
1Lot
|
28 |
In case of DCLC – Primary and secondary loop including Dry/Adiabatic Cooler, Storage Tank, CDU etc. |
1Lot
|
29 |
IBMS including CCTV, NOVEC1230,Water Leak Detector, Rodent Repellent, FAS Aspiration type smoke detection system, I/O for BMS, BMS SW, etc. |
1Lot
|
30 |
ADDITIONAL ITEMS , if any required to complete the solution for datacentre ecosystem |
1Lot
|
31 |
Installation & Commissioning for sl no 23 to 30 |
1Lot
|
32 |
MANPOWER charges for providing warranty (per month for all three shifts (24x7)) for datacentre ecosystem |
36Month
|
33 |
MANPOWER charges - for providing during AMC period (per month for all three shifts (24x7)) for datacentre ecosystem |
36Month
|
34 |
Comprehensive AMC Charges for Year-4 for datacentre ecosystem |
1Lot
|
35 |
Comprehensive AMC Charges for Year-5 for datacentre ecosystem |
1Lot
|
36 |
Comprehensive AMC Charges for Year-6 for datacentre ecosystem |
1Lot
|
37 |
TRAINING |
1Lot
|
38 |
Comprehensive AMC charge for 6th year for all computing nodes and networking components |
1Lot
|
39 |
Comprehensive AMC charge for 6th year for PFS Storage (2.5PiB) |
1Lot
|
40 |
Comprehensive AMC charge for 6th year for 1PiB Archival Tape library for PFS |
1Lot
|
41 |
Comprehensive AMC charge for 6th year for NAS Storage (2.0PiB + 2.0PiB) |
1Lot
|
42 |
Comprehensive AMC charge for 6th year for 1 PiB Archival Tape library for NAS storage |
1Lot
|
43 |
Comprehensive AMC charge for 6th year for Tape library, server and backup software |
1Lot
|
44 |
MANPOWER charges for One System Administration and one Application Engineer Manpower for 6th year |
1Lot
|
45 |
Comprehensive AMC charge for 7th year for all computing nodes and networking components |
1Lot
|
46 |
Comprehensive AMC charge for 7th year for PFS Storage (2.5PiB) |
1Lot
|
47 |
Comprehensive AMC charge for 7th year for 1PiB Archival Tape library for PFS |
1Lot
|
48 |
Comprehensive AMC charge for 7th year for NAS Storage (2.0PiB + 2.0PiB) |
1Lot
|
49 |
Comprehensive AMC charge for 7th year for 1 PiB Archival Tape library for NAS storage |
1Lot
|
50 |
Comprehensive AMC charge for 7th year for Tape library, server and backup software |
1Lot
|
51 |
MANPOWER charges for One System Administration and one Application Engineer Manpower for 7th year |
1Lot
|
52 |
Comprehensive AMC charge for 8th year for all computing nodes and networking components |
1Lot
|
53 |
Comprehensive AMC charge for 8th year for PFS Storage (2.5PiB) |
1Lot
|
54 |
Comprehensive AMC charge for 8th year for 1PiB Archival Tape library for PFS |
1Lot
|
55 |
Comprehensive AMC charge for 8th year for NAS Storage (2.0PiB + 2.0PiB) |
1Lot
|
56 |
Comprehensive AMC charge for 8th year for 1 PiB Archival Tape library for NAS storage |
1Lot
|
57 |
Comprehensive AMC charge for 8th year for Tape library, server and backup software |
1Lot
|
58 |
MANPOWER charges for One System Administration and one Application Engineer Manpower for 8th year |
1Lot
|