Tender No | Centre Name | Tender Description | Bid Closing Date (IST) | Bid Opening Date (IST) | Actions |
---|---|---|---|---|---|
SA202500111201 | SAC | 32-Chnannel thermocouple DAQ system | 30-June-2025 12:00 | 30-June-2025 14:00 | |
IS202500034701 | URSC | Retrofitting of Optical profile Projector of NIKON Make Model No:V-24B. | 07-July-2025 14:30 | 07-July-2025 15:00 | |
SA202500104401 | SAC | Metallic C-ring with energized spring | 04-July-2025 11:00 | 04-July-2025 11:05 | |
TR202500014801 | ISTRAC | Development of Digital Array based Telemetry System | 18-July-2025 13:07 | 18-July-2025 14:07 | |
SA202500102601 | SAC | CMOS RFIC CHARCTERIZATION SETUP | 30-June-2025 15:00 | 30-June-2025 16:00 | |
SA202500110601 | SAC | Linear Programmable 3 Channel DC Power Supplies | 30-June-2025 14:00 | 30-June-2025 15:00 | |
SA202500101301 | SAC | DC Power supply | 30-June-2025 12:00 | 30-June-2025 13:00 | |
VS202500128301 | VSSC | Fixation of rate for TRISP Application | 03-July-2025 14:00 | 03-July-2025 14:30 | |
IS202400014601 | URSC | Development of On-board Modules | 07-July-2025 14:30 | 07-July-2025 15:00 | |
IS202500052301 | URSC | 6DOF Vehicular Motion Testing and Time Synchronization Unit | 26-June-2025 14:30 | 26-June-2025 15:00 | |
VS202400596901 | VSSC | Supply of Coal tar pitch | 10-July-2025 14:00 | 10-July-2025 15:00 | |
IS202500043301 | URSC | Preloaded Precision Grounded Ball Screw Assembly of size M6 x 1 mm | 27-June-2025 14:00 | 27-June-2025 14:30 | |
VS202500185101 | VSSC | Supply, Installation and Commissioning of Cast Iron Surface Plate at VSSC | 10-July-2025 14:00 | 10-July-2025 15:00 | |
TR202400043801 | ISTRAC | Hardware of microwave receiver for atomic frequency standard development | 18-July-2025 14:00 | 18-July-2025 14:30 | |
SA202500049801 | SAC | Aluminium Alloy 6061 T652 Rectangular Bars/Square Bars for RS-3/3A Project | 27-June-2025 15:00 | 27-June-2025 15:15 | |
LP202400098701 | LPSC | Supply of Male Mannequin for rescue training | 16-June-2025 12:00 | 16-June-2025 12:05 | |
IP202500058001 | IPRC | Sporadic outsourcing work contract for CN&IES,COWAA, Telephone systems, LPSC IPRC Camp office, Hindi Cell and DEOs | 27-June-2025 14:00 | 27-June-2025 14:01 | |
VS202500162901 | VSSC | Supply of Titanium alloy Ti3Al2.5V tubes for miniature Electro-Hydraulic actuation system | 03-July-2025 14:00 | 03-July-2025 14:05 | |
IS202500011601 | URSC | Diodes | 20-June-2025 14:00 | 20-June-2025 15:00 | |
SA202400136901 | SAC | Space Grade Data Converter and Power Devices | 04-July-2025 14:00 | 04-July-2025 14:30 | |
SH202500059601 | SDSC SHA | Procurement, Manufacture, Supply, Erection, Testing and Commissioning of Horizontal Sliding Doors for SAF of SLCP, Tuticorin,Tamil Nadu | 30-June-2025 16:30 | 01-July-2025 14:30 | |
IS202500001901 | URSC | TEMPERATURE CONTROLLED ADHESIVE CURING SYSTEM (FULL LENGTH SCALE) | 26-June-2025 14:30 | 26-June-2025 15:00 | |
MC202500007101 | MCF | Non ?Comprehensive Annual Maintenance Contract (NC-AMC) of Antenna Mechanical System works and supply of materials at MCF Bhopal | 30-June-2025 16:30 | 01-July-2025 10:00 | |
IP202500048901 | IPRC | SUPPLY OF CUSTOMIZED CRYOGENIC ELECTRO PNEUMATIC VALVES | 04-July-2025 10:00 | 04-July-2025 10:05 | |
IS202500053601 | URSC | Micro D buffers | 25-June-2025 14:00 | 25-June-2025 14:30 | |
SA202500106401 | SAC | IP PBX TELEPHONE SYSTEM WITH SERVER BASED ARCHITECTURE | 03-July-2025 14:00 | 03-July-2025 14:30 | |
IS202500052501 | URSC | REALISATION, ASSEMBLY, INTEGRATION, ALIGNMENT AND TESTING OF MICROWAVE REFLECTOR | 08-July-2025 14:30 | 08-July-2025 15:00 | |
IP202500056501 | IPRC | Outsourcing Work contract for software development and operation & maintenance work in CTPTI, SDD and AISE DEO for a period of Two years | 25-June-2025 14:00 | 25-June-2025 14:01 | |
IU202500178001 | IISU | Spacegrade MOSFETs | 19-June-2025 14:00 | 19-June-2025 14:15 | |
SA202500032301 | SAC | FABRICATION, ASSEMBLY, TEST & EVALUATION OF INTEGRATED KA-BAND TRANSMITTER AS PER RFP. | 10-July-2025 14:00 | 10-July-2025 14:30 | |
SA202400113501 | SAC | Space Grade Hex Schmitt Trigger Inverter | 25-June-2025 14:00 | 25-June-2025 14:30 | |
SH202500072301 | SDSC SHA | Supply of Low capacity EOT cranes | 25-June-2025 14:00 | 25-June-2025 14:05 | |
LP202500032201 | LPSC | Procurement of CMM stylus | 17-June-2025 12:00 | 17-June-2025 12:05 | |
IU202500177901 | IISU | Space grade connectors | 19-June-2025 14:00 | 19-June-2025 14:15 | |
IP202500055601 | IPRC | High Pressure Seamless Gas Storage Cylinders | 01-July-2025 10:00 | 01-July-2025 10:05 | |
VS202400649401 | VSSC | Supply, Installation & Commissioning of 2.5m class 5-axis CNC Mill Turn Centre | 02-July-2025 14:00 | 02-July-2025 14:10 | |
SA202500065701 | SAC | Vector Network Analyzer (VNA) | 02-July-2025 14:00 | 02-July-2025 14:30 | |
SA202400088001 | SAC | Contract for Development of RF High Power Circulator-Switch Assemblies | 14-July-2025 14:00 | 14-July-2025 14:30 | |
SA202500090701 | SAC | Blackbody Targets for 50-60GHz and 183GHz bands | 02-July-2025 14:00 | 02-July-2025 14:30 | |
SA202500104101 | SAC | 1:2 Power Divider (DC-40GHz) | 01-July-2025 14:00 | 01-July-2025 14:30 | |
LP202500054601 | LPSC | RATE CONTARCT FOR CCTV FACILITY MAINTENANCE | 24-June-2025 14:30 | 24-June-2025 14:30 | |
SA202500093101 | SAC | ozone analyser for ambient ozone monitoring as per specifications | 30-June-2025 14:00 | 30-June-2025 14:30 | |
SA202500089901 | SAC | WR-62 waveguide to SMA Adapter | 30-June-2025 14:00 | 30-June-2025 14:30 | |
IS202500028301 | URSC | PLDRO | 30-June-2025 14:00 | 30-June-2025 14:30 | |
VS202500305301 | VSSC | C Type Thermocouple | 01-July-2025 14:00 | 01-July-2025 14:10 | |
IS202500013801 | URSC | Un-Encapsulated Transistor Dice | 30-June-2025 14:00 | 30-June-2025 14:30 | |
IS202500048201 | URSC | FE ANALYSIS OF DEPLOYABLE MESH ANTENNA WITH BOOMS | 23-June-2025 14:00 | 23-June-2025 14:30 | |
SA202500081001 | SAC | Hi-Rel RAD-HARD Hex Buffer IC | 30-June-2025 14:00 | 30-June-2025 14:30 | |
IS202500025601 | URSC | Data Acquisition System | 27-June-2025 14:30 | 27-June-2025 15:00 | |
HS202500006701 | HSFC | Harness Connectors | 16-June-2025 15:00 | 16-June-2025 15:30 |